 Site Preparation | Prepping site for concrete pour
 Site Preparation | Prepping site for concrete foundation of cabana building
 Framing Cabana | Concrete poured and concrete columns built
| |
|
|
 Framing Roof | Framing roof for cabana building
 Building Roof | Finishing touches on framing cabana roof
 Building Roof | Ceiling of cabana building
| |
|
|
 Framing Cabana | Roof, columns and knee walls framed
 Column Application | Stucco being applied to concrete columns
 Finishing Touches | Siding being applied to knee walls and shingles applied to roof
| |
|
|
 Finishing Touches | Ceiling panels and electricty being applied to cabana
 Forming Knee Walls | Forming knee walls and running electricty
 Finishing Touches | Finishing knee walls and surrounding areas of cabana
| |
|
|