Site Preparation | Prepping site for concrete pour
Site Preparation | Prepping site for concrete foundation of cabana building
Framing Cabana | Concrete poured and concrete columns built
|
|
|
Framing Roof | Framing roof for cabana building
Building Roof | Finishing touches on framing cabana roof
Building Roof | Ceiling of cabana building
|
|
|
Framing Cabana | Roof, columns and knee walls framed
Column Application | Stucco being applied to concrete columns
Finishing Touches | Siding being applied to knee walls and shingles applied to roof
|
|
|
Finishing Touches | Ceiling panels and electricty being applied to cabana
Forming Knee Walls | Forming knee walls and running electricty
Finishing Touches | Finishing knee walls and surrounding areas of cabana
|
|
|